Have a look at the latest plans for the regeneration of the streetscape in the Heritage Triangle. The plans include the proposed road closures during the waorks. Works are due to start around the 17th April, and will take three months.

The proposed works involve the resurfacing of the existing footways and carriageway with new surface materials.  New raised tables are to be installed to help encourage pedestrian movement, while also maintaining vehicle movement in the area.  The existing carriageway parking bays on Market Hill will be removed as part of the proposal to widen the existing footway.

The Regeneration scheme is currently programmed to begin on, or shortly after, the 17th April 2017 lasting approximately 3 months. As shown on PJ3331-0100-013 Road Closure Notification Plan (see attached), the construction will entail four phases of road closures. These phases are just for reference and the order of works are to be confirmed.

During the road closure, the one-way system will be temporarily revoked. Local access and deliveries will be maintained. Business open as usual signs will be displayed within the area. We will endeavour to keep any potential disruption to a minimum and apologise for any inconvenience this may cause.

Once we have more information, the intention is to send you another notification letter in early March. I trust the above information is useful, however, should you wish to discuss the matter further please do not hesitate to contact me on 01603 223073.

 

Download the full letter here.

Download the consultation plan.

Download the proposed road closure plan here.

Leave a Reply

Your email address will not be published. Required fields are marked *